#1 Budget on Pattern
topThe valorization of budget on pattern can be performed according to the various groupings defined on structure: the variances analysis will be linked to the structure detail, without valorizing the single specific source value.
The data loading can be of two types: manual, by giving the amount for an element of each level present; or automatic according to updating flags set on various sub-budgets. The sub-budgets with different types as detail account, C.C and P.C will be the valorization source data of details about pattern groupings for the sub-budget that in turn has set the flag.
RIBBON BAR: the ribbon bar represents the Form menu, that is the area on which it is possible to perform actions linked to the procedure in use. The possible features list is the following:
BuildDate : 29 maggio 2013