Rig

#1 Rig

top

Through this tab it is possible to establish times realted to the rig of the selected phase into the previous tab. The tap data are the following:

Variant: through this column and thanks to the specific combo box the user can select the Variant code of the item to be produced;
Phase – Subphase – Description: through these fields it is possible to view information related to the selected phase within tab;
Type: it shows the phase typology (internal or external);
UM Times: it shows the phase time unit of measure;
Overlap Type: it shows the possible overlap typology;
Value: it shows the possible overlap value;
WkC: in these fields it is possible to view the Work Center code and description of the related selected phase;
Work Center: in these fields it is possible to insert the Work Center code (and description) set for the rig;
Machine: in these fields it is possible to insert machine code (and description) for the rig;
Labour Group: in these fields it is possible to insert Labour Group code (and description) for the rig;
Start Date: it is possible to view the start date of the selected phase into the previous tab;
Rig Time: it is possible to insert the rig time. It is a fix time that doesn’t change according the quantity to be produced in the selected phase;
End Date: it is possible to view the end date of the selected phase into the previous tab;
Re-Rig Time: it is possible to insert re-rig time, that is added to the rig time;
Machines Number: the number of machines used for rig is indicated;
Workers Num.: the number of workers used for rig is indicated.


BuildDate : 31 marzo 2015

Did you find this helpful?
Name 
Email 

Thank you for sending your feedback, the submitted information will be assigned to an internal operator, a notification email (if registered user) will be sent to you when your suggestion were applied.

There was an error processing your feedback information, make sure you provided the requested info.

© 2013 Fluentis Srl. All rights reserved.